【1111中项】试题75-命-管-N.ZJ.00.p000-1.00-The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the (75).A..pµlanning		B.element		C.subtask		D.working interface【正确答案】: B
                    <尚大教育,教育至上,人才为大:sdedu.cc>
 
【1111中项】试题75-命-管-N.ZJ.00.p000-1.00-
The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the (75).
A..pµlanning		B.element		C.subtask		D.working interface
【正确答案】: B